
800 GPM Combination Gravity Separator/DAF Separator in Seismic Zone 4 epoxy painted steel construction loaded for shipment to the Department of Water and Power, City of Los Angeles, California.
|

300 GPM Complete Physical/Chemical Treatment System. A 1990 EPA Superfund Project at the Old Inger Site in Geismer, Louisiana.
|

80 GPM Factory Skid-Mounted Complete Desalination Plant.
|

A Custom Built Control Panel for a Skid Assembled Aqueous Waste Treatment Plant.
|

AquaRound II Zero Discharge Wastewater Treatment/Recycling Plant.
|

Two Side-by-Side 15 GPM ContamAway II Plants built for 1993 Airport Clean-Up project at Andrews AFB in Maryland.
|

AquaRound III, Zero Discharge Wastewater Treatment/Water Recycling Skid Mounted Plants.
|

"SkimAway" Floating Oil Skimmer Model 101-B with 2-inch diameter discharge piping.
|